Got my frame and parts back from powder coat last weekend. Started putting it together this week, it's a slow process as I'm building this out of a few bins of bolts and parts and a couple of junky rollers. The frame is gusseted as per recommendation here, lower cross tube moved about an inch forward to clear the drain plug on a 163FML, sleeved the front down tube and added some mounts for a battery, rectifier and starter relay. Still waiting on my wheels and battery holder to come back from powder. I mounted up a spare front yesterday and realized I have two 350X wheels and hubs (the wheel getting coated is the same as what I have), already powdered both hubs so I'll figure out how to make them fit. I'm planning to go to my shop tomorrow during this snow storm we're getting in New Hampshire so I can get a bit more done than an hour here and there. Hoping to be riding this thing when the trails open up in May, and save my back from the 200S.