InPiEcEs
06-08-2007, 11:27 PM
Well......I got the first of my parts I've ordered today.
The Motion-Pro throttle cable came today for the 38, along with my new clutch set.
It should look like Christmas here for the next 2 weeks or so:D
My fenders are coming, Billet clutch basket, ESR exhaust flange, and pipe.
new bearing carrier, Douglas rim......lots of stuff!!
I took out a loan, and went on a spree......got pretty much everything I need left to get the R done, except maybe a small thing or two here and there that got overlooked.
I decided on the ESR pipe, and sold my PT.......maybe a mistake, maybe not, but I need to wait a bit on the pipe before it ships out.
I will post pics as things progress.:beer
The Motion-Pro throttle cable came today for the 38, along with my new clutch set.
It should look like Christmas here for the next 2 weeks or so:D
My fenders are coming, Billet clutch basket, ESR exhaust flange, and pipe.
new bearing carrier, Douglas rim......lots of stuff!!
I took out a loan, and went on a spree......got pretty much everything I need left to get the R done, except maybe a small thing or two here and there that got overlooked.
I decided on the ESR pipe, and sold my PT.......maybe a mistake, maybe not, but I need to wait a bit on the pipe before it ships out.
I will post pics as things progress.:beer